<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>
    <meta content="text/html; charset=UTF-8" http-equiv="Content-Type">
    <title></title>
  </head>
  <body bgcolor="#ffffff" text="#000000">
    <font face="Times New Roman, Times, serif">@Andrea_paz<br>
      Andrea, the screencasts are your. ;-)<br>
      <br>
      <br>
      @Deim<br>
    </font>
    <blockquote type="cite"><font face="Times New Roman, Times, serif">So
        it seems nesting makes the clips (otherwise sequences or
        subprojects) not to leak to the rest of master project (ex. keys
        in filters). Am I correct?
      </font></blockquote>
    <font face="Times New Roman, Times, serif">Yes, you are correct.<br>
      <br>
      <b>Notice:<br>
        If you don't use Nest feature for the Sequences (subprojects)
        imported.</b><br>
      Your Master Project must have a number of tracks equal or more
      than the subprojects.<br>
      In my "cin20190831_NestingSequencesInAMasterProject" screencast,
      you can see that at the point #2, the second sub project
      (Sequence-02) contains 2 video tracks and 2 audio tracks.<br>
      So, in Master Project you must have at least 2 video tracks and
      2audio tracks (in my example).<br>
      More, you can not load the Sequence (clip) from
      Resources->Clips to the Viewer, and from the Viewer to the
      Timeline otherwise you lose your Autos/Effects (may be a bug, I
      don't know). But You can do that with Nest feature.<br>
      <br>
    </font>
    <blockquote type="cite"><font face="Times New Roman, Times, serif">Does
        the master project keep reference to subprojects or does it copy
        them fully to master project? (I'm asking when I change
        subproject if it somehow change master project).
      </font></blockquote>
    <font face="Times New Roman, Times, serif">When you import your
      Sequences (subprojects) into the Master Project, the Sequences are
      copied in the Master Project: the xml (file project) code of the
      Sequence is joined with the xml of the Master.<br>
      So, if you are working on a Master Project, where subprojects had
      been inserted, and then you change something to a subproject or
      delete a subproject, it doesn't change your Master Project: the
      Master Project is not in sync with the subprojects. That is good
      and bad.<br>
      I hope I explained it well.<br>
      <br>
      Thanks!<br>
      <br>
      IgorBeg</font><br>
  </body>
</html>